Project close-out

FinishSystem Snag Packs

A separate reactive option for finishing details identified during inspection or project close-out.

FinishSystem Snag Pack with components and checklist
Professional finishing through thoughtful engineering

Proactive or reactive

Use the right support route.

OptionWhen usedPurpose
Configured Finishing KitProactivePlanned from drawings, photographs, schedules or project information before installation or repeat assembly.
FinishSystem Snag PackReactiveConfigured around finishing details found during inspection, snagging or project close-out.

Snag Packs support targeted close-out work; they do not replace the core Configured Finishing Kit proposition, which plans the finish as part of the installation from the outset. Availability, contents and timing are agreed for each project.

Complete the detail

Configure a Snag Pack

Show us the detail, the intended interface and the project requirement. We will review the information and confirm the next controlled step.